• Programação da produção em ambientes de manufatura aditiva: análise do estado-da-arte e proposta de método de resolução 

      Dall'Agnol, Gabriela (Universidade Federal de São Carlos, UFSCar, Programa de Pós-Graduação em Engenharia de Produção - PPGEP, Câmpus São Carlos, 05/05/2023)
      With the advancement of production technologies and materials, it is currently possible to use Additive Manufacturing (AM), also known as 3D printing, for the large-scale production of finished products, with numerous ...
    • The crew scheduling and routing problem in road restoration 

      Arteaga, Alfredo Daniel Moreno (Universidade Federal de São Carlos, UFSCar, Programa de Pós-Graduação em Engenharia de Produção - PPGEP, Câmpus São Carlos, 27/03/2020)
      Extreme events as large-scale disasters can cause partial or total disruption of basic services such as water, energy, communication and transportation. In particular, recovering the transportation infrastructure is of ...